Customization: | Available |
---|---|
Warranty: | 1 Year Warranty Including Spare Parts |
Max. Sheet(Wxl): | 540*760mm |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Thermal Film Laminating Machine For Packaging, Book, Box
Film Laminating Machine | |
Model | ECOO YFMA-540 |
Max. Sheet(WxL) | 540*760mm |
Min. Sheet(WxL) | 210*270mm |
Machine Speed | Max. 30m/min |
Paper Thickness | 157~400g/m2 |
Voltage | 380V |
Laminating Temperature | 80-110ºC |
Power Required | 17kw |
Dimension(LxWxH) | 3000*1450*1650mm |
N.W. | 2000kg |
Series | Accessory Name | Brand | Note | |
1 | Pressure rubber roller | Jingyang | JingYang | Taiwan |
2 | feeder | RUN | Offset feeder | |
3 | Bearing | Harbin | ||
4 | Vacuum pump | Shanghai Mengxu | ||
5 | chain | Hangzhou | ||
6 | Pneumatic clutch | Taiwan | Taiwan | |
7 | Servo motor | Inovance | Shenzhen | |
8 | Server Driver | Inovance | Shenzhen | |
9 | Oil hydraulic pump | Zhejiang | ||
10 | electromagnetic heating | Shenzhen | ||
11 | Touch screen | Weiluntong | ||
12 | Pneumatic parts | Airtac | Taiwan | |
13 | Button | OMRON | OMRON | Japan |
14 | Contactor.relay | Schneider | France | |
15 | Sensor | Panasonic | Japan | |
16 | Proximity switch | Panasonic | Japan | |
17 | Temperature Controller | OMRON | OMRON | Japan |
18 | Photoelectric switch | Panasonic | Japan | |
19 | PLC | Delta | Taiwan | |
20 | Frequency converter | Delta | taiwan |
Q1: How long is the lead time ? A: The lead time is normally 30 days. We can accelerate for emergency cases. |
Q2: Is there any certification for your machine ? A: Yes, all our machines have been certified by SGS and CE. |
Q3: How long is the warranty period ? A: 12 months for electric parts, the service is for whole life, once you asked the spare parts, we can send immediately, customer afford the courier fee. (Since the date of purchase from delivery and on the board, within 12 months) |
Q4: What is your normal payment term ? A: Normally, 30%TT deposit, 70% before shipping, or LC at sight. |
Q5: What about the training content ? A: All machines have been finished all adjustment and test in NEW STAR workshop before delivery, the mechanical structure, components adjustment, electrical operation of the switch, and the matters needing attention, day-to-day maintenance of equipment, etc., In order to ensure the normal operation of equipment, later. |